Oil & Gas

When quality matters

Michels Canada is a leader in building reliable, safe oil and gas facilities. Customers depend on us to construct pipelines and facilities in an efficient, technically sound manner. Communities count on us to work harmoniously and with minimal disruptions to homeowners, traffic, businesses and the environment.

We are experienced with many methods for fabricating, constructing and maintaining oil and gas facilities, and working with customers to select the right method to achieve their goals.

Projects

Michels Canada performed an emergency horizontal directional drill (HDD) of 469 metres. The project was a 5-string bundle of 4-inch, 8-inch and three 12-inch pipes.

Horizontal Directional Drilling

Pouce Coupe River Crossing

BC

View Project

Pouce Coupe River Crossing

Michels constructed a 36.2 km (22.5-mile), 30-inch pipeline for the Thornbury section of the Liege Lateral Loop 2.

Mainline Pipeline

Liege Lateral Loop 2

BC

View Project

Liege Lateral Loop 2

Michels completed 49.6 km natural gas pipeline constructed in Ontario's HydroOne corridor.

Mainline Pipeline

GTA Mainline

ON

View Project

GTA Mainline

Michels installed a new 500 metre crossing of NPS 30 pipe beneath the river using horizontal drilling technology (HDD).

Horizontal Directional Drilling

Moberly River Crossing

BC

View Project

Moberly River Crossing

Michels was the Prime Contractor on the FortisBC Coastal Transmission System Project in the Lower Mainland of British Columbia.  The 11 kilometre project consisted of 36-inch and 42-inch new pipe construction in a heavily urban environment.

Horizontal Directional Drilling

FortisBC Coastal Transmission System (CTS)

BC

View Project

FortisBC Coastal Transmission System (CTS)

Michels installed Seven 42-inch heavy wall pipeline trenchless crossings.

Horizontal Directional Drilling

Northern Courier Crossings

BC

View Project

Northern Courier Crossings

Michels drilled a 966-metre, 36-inch hole under the North Saskatchewan River to simultaneously install a 24-inch welded steel pipeline segment and two strands of 1 1/4-inch polyethylene conduit containing fiber optic cables.

Horizontal Directional Drilling

North Saskatchewan River

AB

View Project

North Saskatchewan River

Michels successfully replaced the Chilliwack Pipeline in the Chilliwack Mall section.

Mainline Pipeline

Chilliwack Pipeline Replacement

BC

View Project

Chilliwack Pipeline Replacement

Michels used the Direct Pipe methodology to install 342 metres of 42-inch oil pipeline under the Beaver River.

Direct Pipe

Cold Lake & Polaris Expansion

AB

View Project

Cold Lake & Polaris Expansion

Michels completed three Horizontal Directional Drills (HDD) and one Direct Pipe installation as part of the Cold Lake South Mainline Loop, an NPS 42 bitumen pipeline originating at the IPF LaCory Facility north of Bonnyville, Alberta to the IPF Facility in Hardisty, Alberta.

Horizontal Directional Drilling

Cold Lake South Mainline Loop HDD

AB

View Project

Cold Lake South Mainline Loop HDD

Michels used HDD to complete a 800 metre of 12-inch pipe installation under the St. Lawrence River.

Horizontal Directional Drilling

St. Lawrence River Crossing

ON

View Project

St. Lawrence River Crossing

Construction consisted of a 305-metre horseshoe tunnel with a diameter of 1800 millimetres, a cast-in-place junction chamber, a live sewer tie-in, and a 1200-millimetre diameter sewer installed beneath a very busy arterial roadway.

Horizontal Directional Drilling

Jervis Forcemain

BC

View Project

Jervis Forcemain

Michels was prime contractor for installation of a power cable duct under False Creek in conjunction with the Vancouver City Central Transmission Project.

Horizontal Directional Drilling

Vancouver City Central Transmission

BC

View Project

Vancouver City Central Transmission

Michels installed 2,273 metres of 20-
inch steel pipe through solid rock under the St. Lawrence Seaway.

Horizontal Directional Drilling

Gazoduc Pipeline

QC

View Project

Gazoduc Pipeline

Michels constructed a 63 kilometers of 36-inch from Killam to Hardisty.

Mainline Pipeline

E2H

AB

View Project

E2H

Teamwork: Simply stated, it is less me and more we.

Anonymous

Great teamwork can do great things.