Sewer & Water

Dependable service

Michels Canada helps our customers provide dependable, efficient water and sewer services. Our experienced leaders know how to assemble precisely the right team, equipment and strategy to maximize performance on every project.

Projects

The parallel tunnels both run a length of 1500m at a below ground depth of approximately 14m in Saskatoon.

Tunneling

McOrmond Drive Sanitary & Sewer

SK

View Project

McOrmond Drive Sanitary & Sewer

Michels completed a Microtunneling project for the city of Edmonton.

Tunneling

Big Lake W14

AB

View Project

Big Lake W14

Construction consisted of a 305-metre horseshoe tunnel with a diameter of 1800 millimetres, a cast-in-place junction chamber, a live sewer tie-in, and a 1200-millimetre diameter sewer installed beneath a very busy arterial roadway.

Tunneling

Jervis Forcemain

BC

View Project

Jervis Forcemain

Michels performed a pilot study to rehabilitate a deteriorating segment of 2,642-millimetre diameter sanitary sewer, approximately 30 metres long.

Municipal - Pipe Rehabilitation

16th Ave Sanitary Sewer Rehabilitation Pilot Study

ON

View Project

16th Ave Sanitary Sewer Rehabilitation Pilot Study

Michels was subcontracted to provide all labour, equipment and materials required to complete two 36-inch diameter Horizontal Directional Drills (HDDs) on the King's North Connection Project, an 11-kilometre pipeline project.

Horizontal Directional Drilling

King's North Connection Project HDD

View Project

King's North Connection Project HDD

Michels built a 148-metre long, 1.8-metre diameter tunnel under the Mary Hill Bypass, a major four-lane highway in the Vancouver metropolitan area, to house a 1.5-metre diameter water main.

Tunneling

Port Mann Main No. 2

BC

View Project

Port Mann Main No. 2

Coming together is a beginning; keeping together is progress;
working together is success.

Steve Jobs

It's not bragging if you can do it.

Contact Us