Michels Canada has been using the Direct Pipe® method for trenchless installation of a prefabricated pipe longer than any other contractor in Canada. This trenchless method combines elements of tunneling and HDD, and is well suited for small sites, construction under highways, rail tracks and waterways, and in ground conditions that are not ideal for HDD.

Projects

Michels used the Direct Pipe methodology to install 342 metres of 42-inch oil pipeline under the Beaver River.

Direct Pipe

Cold Lake & Polaris Expansion

AB

View Project

Cold Lake & Polaris Expansion

Michels was the Prime Contractor on the FortisBC Coastal Transmission System Project in the Lower Mainland of British Columbia.  The 11 kilometre project consisted of 36-inch and 42-inch new pipe construction in a heavily urban environment.

Direct Pipe

FortisBC Coastal Transmission System (CTS)

BC

View Project

FortisBC Coastal Transmission System (CTS)

Michels completed three Horizontal Directional Drills (HDD) and one Direct Pipe installation as part of the Cold Lake South Mainline Loop, an NPS 42 bitumen pipeline originating at the IPF LaCory Facility north of Bonnyville, Alberta to the IPF Facility in Hardisty, Alberta.

Direct Pipe

Cold Lake South Mainline Loop HDD

AB

View Project

Cold Lake South Mainline Loop HDD

A successful team is a group of
many hands but of one mind

Bill Bethel

We do that.

Contact Us