Mainline Pipeline

E2H

E2H

Scope

Michels was the prime contractor, managed and constructed the mainline installation scope of work for the 63 kilometres of NPS 36-inch pipe for the Enbridge Edmonton to Hardisty (E2H) Line 67 Pipeline Project.

Michels successfully completed all the mainline, valve and building installation as well as seven large HDD's with multiple isolated open cut water crossings, including a sheet piled isolated crossing of the battle river.

Projects

Michels constructed a 36.2 km (22.5-mile), 30-inch pipeline for the Thornbury section of the Liege Lateral Loop 2.

Mainline Pipeline

Liege Lateral Loop 2

BC

View Project

Liege Lateral Loop 2

Michels completed 49.6 km natural gas pipeline constructed in Ontario's HydroOne corridor.

Mainline Pipeline

GTA Mainline

ON

View Project

GTA Mainline

Michels successfully replaced the Chilliwack Pipeline in the Chilliwack Mall section.

Mainline Pipeline

Chilliwack Pipeline Replacement

BC

View Project

Chilliwack Pipeline Replacement