Pouce Coupe, BC
2019
HDD
Michels Canada performed an emergency horizontal directional drill (HDD) of 469 metres. The project was a 5-string bundle of 4-inch, 8-inch and three 12-inch pipes. Prior to drilling, 24 metres of 60-inch casing was installed to counteract the release of cobble and soil.