Scope

Michels was the Prime Contractor on the FortisBC Coastal Transmission System Project in the Lower Mainland of British Columbia. The 11-kilometre project consisted of 36-inch and 42-inch new pipe construction in a heavily urban environment.

The project included more than 300 facility crossings while working in parallel proximity to Metro Vancouver's water main and force main sanitary lines as well as the existing FortisBC natural gas transmission line. There were 25 road crossings and 7 watercourse crossings on the project.

Projects

Michels Canada performed an emergency horizontal directional drill (HDD) of 469 metres. The project was a 5-string bundle of 4-inch, 8-inch and three 12-inch pipes.

Horizontal Directional Drilling

Pouce Coupe River Crossing

BC

View Project

Pouce Coupe River Crossing

Michels constructed a 36.2 km (22.5-mile), 30-inch pipeline for the Thornbury section of the Liege Lateral Loop 2.

Horizontal Directional Drilling

Liege Lateral Loop 2

BC

View Project

Liege Lateral Loop 2

Michels installed a new 500 metre crossing of NPS 30 pipe beneath the river using horizontal drilling technology (HDD).

Horizontal Directional Drilling

Moberly River Crossing

BC

View Project

Moberly River Crossing

Michels installed Seven 42-inch heavy wall pipeline trenchless crossings.

Horizontal Directional Drilling

Northern Courier Crossings

BC

View Project

Northern Courier Crossings

Michels drilled a 966-metre, 36-inch hole under the North Saskatchewan River to simultaneously install a 24-inch welded steel pipeline segment and two strands of 1 1/4-inch polyethylene conduit containing fiber optic cables.

Horizontal Directional Drilling

North Saskatchewan River

AB

View Project

North Saskatchewan River

Michels completed three Horizontal Directional Drills (HDD) and one Direct Pipe installation as part of the Cold Lake South Mainline Loop, an NPS 42 bitumen pipeline originating at the IPF LaCory Facility north of Bonnyville, Alberta to the IPF Facility in Hardisty, Alberta.

Horizontal Directional Drilling

Cold Lake South Mainline Loop HDD

AB

View Project

Cold Lake South Mainline Loop HDD

Michels used HDD to complete a 800 metre of 12-inch pipe installation under the St. Lawrence River.

Horizontal Directional Drilling

St. Lawrence River Crossing

ON

View Project

St. Lawrence River Crossing

Construction consisted of a 305-metre horseshoe tunnel with a diameter of 1800 millimetres, a cast-in-place junction chamber, a live sewer tie-in, and a 1200-millimetre diameter sewer installed beneath a very busy arterial roadway.

Horizontal Directional Drilling

Jervis Forcemain

BC

View Project

Jervis Forcemain

Michels was prime contractor for installation of a power cable duct under False Creek in conjunction with the Vancouver City Central Transmission Project.

Horizontal Directional Drilling

Vancouver City Central Transmission

BC

View Project

Vancouver City Central Transmission

Michels installed 2,273 metres of 20-
inch steel pipe through solid rock under the St. Lawrence Seaway.

Horizontal Directional Drilling

Gazoduc Pipeline

QC

View Project

Gazoduc Pipeline

Teamwork: Simply stated, it is less me and more we.

Anonymous

Great teamwork can do great things.

Contact Us