Toronto, ON
2017
Horizontal Directional Drilling
Michels was subcontracted to provide all labour, equipment and materials required to complete two 36-inch diameter Horizontal Directional Drills (HDDs) on the King's North Connection Project, an 11-kilometre pipeline project.
The Major MacKenzie Drive HDD was 1191 metres long and the Rutherford Road HDD was 1319 metres long.